BAKER HUGHES CABLE PLANT (TYUMEN)

BAKER HUGHES CABLE PLANT (TYUMEN)

Baker Hughes is one of the world's largest oil field services companies. It operates in over 90 countries, providing the oil and gas industry with products and services for oil drilling, formation evaluation, completion, production and reservoir consulting. Baker Hughes has its headquarters in Houston. The company's Russian offices are also located in Noyabrsk, Orenburg, Nizhnevartovsk, Novosibirsk and Tyumen as well as Aktau & Atyrau in Kazakhstan

_______________________________________________________

Information on this new production facility from Baker Hughes:

The Baker Hughes Tyumen facility is located in Western Siberia, in close prximity to oil and gas operations in the region. This means quicker response times, lower delivery costs, and reduced non-productive time

Baker Hughes is able to tailor commercial and technical offerings delivered from the Tyumen facility to meet specific needs in the region; thus, ensuring customers receive the best system for specific challenges and production goals

The Tyument manufacturing team is made up of more than 200 highly trained engineers, manufacturing technicians, technical support personnel, and customer serve representatives - each receiving advanced training to ensure safe, efficient operations.

_______________________________________________________

The total investment by Baker Hughes into this manufacturing facility was almost $60 million, the construction period from our appointment was 23 months. The plant started production in 2014.

In addition to constructing the 31,000 m2 factory we also undertook a capital remont of the adjacent 5,000m2 office building and the construction of a 1.7 km railway connection direct from the factory to the main railway line.

This is only the 2nd plant of its type in the world. Altaca's key managemant for the project visited the original facility and thereafter closely consulted with the Client's experts to ensure that the end result met all their expectations. 

Altaca have been working with Baker Hughes in Russia since 2003 under a Framework Agreement and have undertaken projects for them previously in Moscow, Nizhnevartovsk, Nefteyugansk and Noyabrsk

 

BAKER HUGHES CABLE PLANT (TYUMEN)

 

Design-build turnkey construction, reconstruction & interior finishing of Cable Manufacturing Facility including regional head office, storage facilities, boiler house, rail road connection, infrastructure works and landscaping

Location : Tyumen Siberia, Russia
Design : Energy Architecture
Architect : Altaca - Arnok
Engineers : Altaca - Osnov
Area : 36,000 m2